Products
About us
News
Service
Distributors
Download
Gallery
Contact us
News
World's leading manufacturer of Bus Air Conditioner and Truck Refrigeration Units

How to Change a Truck AC Accumulator and Expansion Valve

Aug 24, 2017
Truck air conditioning systems rely on an accumulator to store refrigerant after it leaves the evaporator coils on its way to the compressor. This allows remaining liquid refrigerant to evaporate before continuing through the truck air conditioning systems and the device contains a desiccant to remove any moisture the system contains. Here are steps to help you change your accumulator as well as the expansion valve in your truck air conditioner units.
 
Step 1:
Check your local laws to make sure it is legal for a non-certified individual to do this type of work. Since it will require purging any refrigerant, and purchasing replacement refrigerant, some jurisdictions may require a license to do the work.
 
Step 2:
Make sure changing the accumulator is necessary. Since the accumulator contains a desiccant to remove moisture from the refrigerant, if the system has been discharged and improperly recharged or needs recharging, changing the accumulator will help ensure the system works efficiently after recharging. It is also recommended the accumulator is replaced whenever a compressor is replaced as well.
 
Step 3:
Buy the needed parts. You can order a new accumulator from suppliers online, your local auto parts dealer, or from your vehicle manufacturer dealership parts store. Buy a replacement expansion valve (also known as an orifice tube) if you plan to replace it as well. The expansion valve is located in the refrigerant tubing at the bottom of the evaporator coils, and as with the accumulator, they can collect debris which impede their performance if the system has been compromised. Also, when changing the compressor, replacement of the expansion valve is usually a requirement for warranty coverage of the new compressor.
 
Step 4:
Remove or discharge any remaining refrigerant from the truck air conditioning systems. It is better to have this done at a shop that has a refrigerant reclamation machine, but if the system is already discharged, this step can be skipped. Simply loosen the valve on the low pressure (suction) charging fitting and listen for escaping refrigerant to determine if the truck air conditioning systems is still charged.
 
Step 5:
Remove the pressure sensor connector from the accumulator. This can usually be unplugged, but be careful, as there may be a clip that needs to be depressed or pried up to release it.
 
Step 6:
Loosen the inlet and outlet couplings on the accumulator. Use the correct wrenches, and make sure the fittings do not allow the refrigerant lines to twist. You may to need two wrenches, one on the fitting and another on the compression nut that secures it to prevent damaging the refrigerant lines.
 
Step 7:
Loosen the clamp or support device that secures the accumulator in position. You can now completely remove the couplings and lift the accumulator out of the engine compartment. Make sure to keep it upright, as refrigerant oil and other nasty liquids may be in the bottom of it.
 
Step 8:
Loosen the fittings that join the high pressure refrigerant line near where it enters the bottom of the evaporator coil. Be sure to use a wrench on both nuts, since one is soldered onto the line and allowing it to twist will damage it. After the coupling is completely loosened, you can pull the two pipes apart.
 
Step 9:
Look for a plastic (usually) tab just inside the tubing leading into the evaporator coil housing. You can grip this with a pair of needle nosed pliers to pull the expansion valve (again, also called the orifice tube) from the tube. Note that refrigerant oil may leak from the tube if any has accumulated in the evaporator coils.

airpro 2000 air conditioner
PHOTO: Guchen Airpro 2000 electric truck cabin air conditioner mounts on on the side of crane in Saudi Arabia.
 
Step 10:
Blow out the evaporator coils with compressed air or compressed nitrogen to make sure no oil or debris is clogging them.
 
Step 11:
Install the new expansion valve, the tapered end with an o ring should go in toward the evaporator coils. Check to see if the o ring in the refrigerant line coupling is still in good condition, then reattach the fittings that connect this pipe.
 
Step 12:
Install the new accumulator into its mounting bracket or support.
 
Step 13:
Install the pressure sensor in the new accumulator. You can either buy a new one, or remove the one from the old accumulator and reuse it. If reusing your old one, it is generally a good idea to use a new seal or o ring when reinstalling it.
 
Step 14:
Install new o rings on the refrigerant line fittings on the accumulator, then reconnect the fittings and tighten them securely. You should now be able to either charge the truck air conditioner units with new refrigerant or have it done at a licensed auto repair shop. Continue reading for basic instructions if you plan to proceed yourself.
 
Step 15:
Use a vacuum pump to evacuate the truck air conditioner units so no moisture remains in it. Allow the pump to hold a vacuum for at least 90 minutes before recharging the truck air conditioning systems.
 
Step 16:
Attach a refrigerant charging hose to a can of refrigerant, puncture the can (follow the instructions on the can if using 12 oz cans that require it), vent the air from the hose, and make sure the fittings are not leaking.
 
Step 17:
Start the engine and turn the truck air conditioner units on high cool and high fan. Open the charging valve and allow the refrigerant to enter the system. This can be a very slow process depending on the ambient temperature, do not rush it.
 
Step 18:
Test all fittings for leak using a foaming soap mixture, clean up, and dispose of old parts and cleaning products safely.
 
Guchen Ecooler rooftop mounted air conditioners include Ecooler 2400 and Ecooler 3200, their cooling capacity is 2400W and 3200W respectively. Both are integrated (one-piece) rooftop mounted, DC powered 12 volt or 24 volt, R134a Eco-friendly refrigerant. It usually applies on:
 
▲ All kinds of truck cabins
▲ Mining trucks
▲ Construction machinery, such as excavators
▲ RV, vans, minibus  
▲ Agricultural machineries, tractors 
 
The Ecooler series battery powered air conditioner units designed by Guchen Industry and this rooftop mounted air conditioner have more reliable working performance which is more suitable for those who want to reduce more fuel consumption and focus on ecofriendly conditions! According to the testing and calculating data by our technician, this Ecooler 12 volt air conditioner for semi-trucks can save 3000 gallon fuel per year. 

guchen ecooler 2400 air conditioner
PHOTO: Guchen Ecooler 2400 battery powered air conditioner units installed on a tractor in Central America.
 
Also some countries enact the law that when the truck stops, and its engine must be off. While this electric truck cabin air conditioner can realize that truck engine is off but cooling continues! And for long-distance and long-time driven, people can choose sleep on the truck, so this air conditioner for tractors can help save a lot money and give drivers a comfortable condition at relaxing time.
 
Share:
Contact us
Your Name
Your Country
*Your Email
Your Phone
*Please describe your requirements in detail.